Thor SLV-2A Agena D | KH-4A 2

Operated by United States Air Force, the Government/Top Secret mission Thor SLV-2A Agena D | KH-4A 2 delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
United States Air Force
Mission type
Government/Top Secret
Launch pad
Space Launch Complex 2W
Payload
—
Target orbit
LEO
Thor SLV-2A Agena D | KH-4A 2 cover image

Mission timeline

  1. 1963-09-23T23:00:00.000Z
    Liftoff
    Liftoff confirmed — Thor SLV-2A Agena D is airborne.
  2. Max-Q
    Max Q — Thor SLV-2A Agena D endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches LEO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: