Thor DM-21 Ablestar | Transit-O 2 & 5E-5

United States Air Force flew Thor DM-21 Ablestar | Transit-O 2 & 5E-5 on a Thor DM-21 Ablestar out of Vandenberg SFB, CA, USA, placing its payload in PO.

Launch time
Status
SUCCESS
Operator
United States Air Force
Mission type
Navigation
Launch pad
Space Launch Complex 2W
Payload
—
Target orbit
PO
Thor DM-21 Ablestar | Transit-O 2 & 5E-5 cover image

Mission timeline

  1. 1964-12-13T00:08:10.000Z
    Liftoff
    Thor DM-21 Ablestar roars off the pad at Vandenberg SFB, CA, USA.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in PO.
  7. Mission success
    All mission objectives achieved.

Last updated: