Thor Burner 1 | OPS 8386

Thor Burner 1 | OPS 8386 lifted off aboard a Thor Burner 1 from Vandenberg SFB, CA, USA, carrying its payload to SSO.

Launch time
Status
SUCCESS
Operator
United States Air Force
Mission type
Government/Top Secret
Launch pad
Space Launch Complex 10W
Payload
—
Target orbit
SSO

Mission timeline

  1. 1965-05-20T16:30:53.000Z
    Liftoff
    Liftoff confirmed — Thor Burner 1 is airborne.
  2. Max-Q
    Max Q — Thor Burner 1 endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches SSO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: