Spectrum | Maiden Flight
The Test Flight flight Spectrum | Maiden Flight departed Andøya Spaceport atop a Spectrum, bound for SSO.
- Launch time
- Status
- FAILED
- Operator
- Isar Aerospace
- Mission type
- Test Flight
- Rocket
- Spectrum
- Launch site
- Andøya Spaceport
- Launch pad
- Orbital Launch Pad
- Payload
- —
- Target orbit
- SSO

Mission timeline
- 2025-03-30T10:30:00.000ZSpectrum roars off the pad at Andøya Spaceport.
- The vehicle reaches Max Q, the highest aerodynamic load of the flight.
- Flight anomaly — the mission is unsuccessful.