Space Shuttle Discovery / OV-103 | STS-51-G

Operated by Lockheed Space Operations Company, the Communications mission Space Shuttle Discovery / OV-103 | STS-51-G delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
Lockheed Space Operations Company
Mission type
Communications
Launch pad
Launch Complex 39A
Payload
—
Target orbit
LEO
Space Shuttle Discovery / OV-103 | STS-51-G cover image

Mission timeline

  1. 1985-06-17T11:33:00.000Z
    Liftoff
    Space Shuttle roars off the pad at Kennedy Space Center, FL, USA.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in LEO.
  7. Mission success
    All mission objectives achieved.

Last updated: