Space Shuttle Discovery / OV-103 | STS-41-D

Operated by Lockheed Space Operations Company, the Communications mission Space Shuttle Discovery / OV-103 | STS-41-D delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
Lockheed Space Operations Company
Mission type
Communications
Launch pad
Launch Complex 39A
Payload
—
Target orbit
LEO
Space Shuttle Discovery / OV-103 | STS-41-D cover image

Mission timeline

  1. 1984-08-30T12:41:50.000Z
    Liftoff
    Space Shuttle lifts off from Kennedy Space Center, FL, USA.
  2. Max-Q
    Space Shuttle passes through max aerodynamic pressure (Max Q).
  3. Main engine cutoff (MECO)
    Main engine cutoff — the first stage shuts down as planned.
  4. Stage separation
    Stage separation — the first stage separates cleanly.
  5. Second-stage ignition
    Second-stage engine ignites for the next phase of flight.
  6. Orbit insertion
    Orbit insertion confirmed — the vehicle is now in LEO.
  7. Mission success
    Mission success — all objectives completed.

Last updated: