Space Shuttle Columbia / OV-102 | STS-90

Operated by United Space Alliance, the orbital mission Space Shuttle Columbia / OV-102 | STS-90 delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
United Space Alliance
Mission type
Orbital
Launch pad
Launch Complex 39B
Payload
—
Target orbit
LEO
Space Shuttle Columbia / OV-102 | STS-90 cover image

Mission timeline

  1. 1998-04-17T18:19:00.000Z
    Liftoff
    Space Shuttle roars off the pad at Kennedy Space Center, FL, USA.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in LEO.
  7. Mission success
    All mission objectives achieved.

Last updated: