Space Shuttle Columbia / OV-102 | STS-9

Rockwell International flew Space Shuttle Columbia / OV-102 | STS-9 on a Space Shuttle out of Kennedy Space Center, FL, USA, placing its payload in LEO.

Launch time
Status
SUCCESS
Operator
Rockwell International
Mission type
Orbital
Launch pad
Launch Complex 39A
Payload
—
Target orbit
LEO
Space Shuttle Columbia / OV-102 | STS-9 cover image

Mission timeline

  1. 1983-11-28T16:00:00.000Z
    Liftoff
    Liftoff confirmed — Space Shuttle is airborne.
  2. Max-Q
    Max Q — Space Shuttle endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches LEO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: