Space Shuttle Columbia / OV-102 | STS-1

Operated by National Aeronautics and Space Administration, the Test Flight mission Space Shuttle Columbia / OV-102 | STS-1 delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
National Aeronautics and Space Administration
Mission type
Test Flight
Launch pad
Launch Complex 39A
Payload
—
Target orbit
LEO
Space Shuttle Columbia / OV-102 | STS-1 cover image

Mission timeline

  1. 1981-04-12T12:00:04.000Z
    Liftoff
    Space Shuttle roars off the pad at Kennedy Space Center, FL, USA.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in LEO.
  7. Mission success
    All mission objectives achieved.

Last updated: