SLS Block 1 | Artemis II

The Human Exploration flight SLS Block 1 | Artemis II departed Kennedy Space Center, FL, USA atop a Space Launch System (SLS), bound for Lunar flyby.

Launch time
Status
SUCCESS
Operator
National Aeronautics and Space Administration
Mission type
Human Exploration
Launch pad
Launch Complex 39B
Payload
—
Target orbit
Lunar flyby
SLS Block 1 | Artemis II cover image

Mission timeline

  1. 2026-04-01T22:35:12.000Z
    Liftoff
    Liftoff confirmed — Space Launch System (SLS) is airborne.
  2. Max-Q
    Max Q — Space Launch System (SLS) endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches Lunar flyby, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: