SLS Block 1 | Artemis I

Operated by National Aeronautics and Space Administration, the Human Exploration mission SLS Block 1 | Artemis I delivered its payload into LO.

Launch time
Status
SUCCESS
Operator
National Aeronautics and Space Administration
Mission type
Human Exploration
Launch pad
Launch Complex 39B
Payload
—
Target orbit
LO
SLS Block 1 | Artemis I cover image

Mission timeline

  1. 2022-11-16T06:47:44.000Z
    Liftoff
    Space Launch System (SLS) lifts off from Kennedy Space Center, FL, USA.
  2. Max-Q
    Space Launch System (SLS) passes through max aerodynamic pressure (Max Q).
  3. Main engine cutoff (MECO)
    Main engine cutoff — the first stage shuts down as planned.
  4. Stage separation
    Stage separation — the first stage separates cleanly.
  5. Second-stage ignition
    Second-stage engine ignites for the next phase of flight.
  6. Orbit insertion
    Orbit insertion confirmed — the vehicle is now in LO.
  7. Mission success
    Mission success — all objectives completed.

Last updated: