Scout X-1 | P-21

Operated by National Aeronautics and Space Administration, the Earth Science mission Scout X-1 | P-21 delivered its payload into Sub.

Launch time
Status
SUCCESS
Operator
National Aeronautics and Space Administration
Mission type
Earth Science
Rocket
Scout X-1
Launch pad
Launch Area 3
Payload
—
Target orbit
Sub
Scout X-1 | P-21 cover image

Mission timeline

  1. 1961-10-19T17:38:00.000Z
    Liftoff
    Scout X-1 roars off the pad at Wallops Flight Facility, Virginia, USA.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in Sub.
  7. Mission success
    All mission objectives achieved.

Last updated: