Scout D-1 | GP-A

Scout D-1 | GP-A lifted off aboard a Scout D-1 from Wallops Flight Facility, Virginia, USA, carrying its payload to Sub.

Launch time
Status
SUCCESS
Operator
National Aeronautics and Space Administration
Mission type
Suborbital
Rocket
Scout D-1
Launch pad
Launch Area 3A
Payload
—
Target orbit
Sub
Scout D-1 | GP-A cover image

Mission timeline

  1. 1976-06-18T11:41:00.000Z
    Liftoff
    Scout D-1 roars off the pad at Wallops Flight Facility, Virginia, USA.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in Sub.
  7. Mission success
    All mission objectives achieved.

Last updated: