Qaem 100 | Chamran-1

Qaem 100 | Chamran-1 lifted off aboard a Qaem 100 from Shahrud Missile Test Site, Islamic Republic of Iran, carrying its payload to LEO.

Launch time
Status
SUCCESS
Operator
Islamic Revolutionary Guard Corps Aerospace Force
Mission type
Technology
Rocket
Qaem 100
Launch pad
Launch Platform
Payload
—
Target orbit
LEO
Qaem 100 | Chamran-1 cover image

Mission timeline

  1. 2024-09-14T05:58:00.000Z
    Liftoff
    Qaem 100 roars off the pad at Shahrud Missile Test Site, Islamic Republic of Iran.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in LEO.
  7. Mission success
    All mission objectives achieved.

Last updated: