PSLV XL | Mars Orbiter Mission (MOM)

The orbital flight PSLV XL | Mars Orbiter Mission (MOM) departed Satish Dhawan Space Centre, India atop a PSLV-XL, bound for the designated orbit.

Launch time
Status
SUCCESS
Operator
Indian Space Research Organization
Mission type
Orbital
Rocket
PSLV-XL
Launch pad
Satish Dhawan Space Centre First Launch Pad
Payload
—
Target orbit
Unknown
PSLV XL | Mars Orbiter Mission (MOM) cover image

Mission timeline

  1. 2013-11-05T09:08:00.000Z
    Liftoff
    PSLV-XL roars off the pad at Satish Dhawan Space Centre, India.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Mission success
    All mission objectives achieved.

Last updated: