Proton-M Briz-M | SES-7 (Indostar 2/ProtoStar 2)

Proton-M Briz-M | SES-7 (Indostar 2/ProtoStar 2) rode a Proton-M Briz-M into space from Baikonur Cosmodrome, Republic of Kazakhstan, deploying its payload to GTO.

Launch time
Status
SUCCESS
Operator
International Launch Services
Mission type
Communications
Launch pad
200/39 (200L)
Payload
—
Target orbit
GTO
Proton-M Briz-M | SES-7 (Indostar 2/ProtoStar 2) cover image

Mission timeline

  1. 2009-05-16T00:57:38.000Z
    Liftoff
    Proton-M Briz-M roars off the pad at Baikonur Cosmodrome, Republic of Kazakhstan.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in GTO.
  7. Mission success
    All mission objectives achieved.

Last updated: