Pallas-1 | Demo Flight

Operated by Galactic Energy, the Test Flight mission Pallas-1 | Demo Flight delivered its payload into SSO.

Launch time
Status
SUCCESS
Operator
Galactic Energy
Mission type
Test Flight
Rocket
Pallas-1
Launch pad
Pallas-1 Launch Pad
Payload
—
Target orbit
SSO
Pallas-1 | Demo Flight cover image

Mission timeline

  1. 2026-09-01T02:00:00.000Z
    Liftoff
    Liftoff confirmed — Pallas-1 is airborne.
  2. Max-Q
    Max Q — Pallas-1 endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches SSO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: