Nuri | Flight Test 2

Nuri | Flight Test 2 lifted off aboard a Nuri from Naro Space Center, South Korea, carrying its payload to SSO.

Launch time
Status
SUCCESS
Operator
Korea Aerospace Research Institute
Mission type
Test Flight
Rocket
Nuri
Launch pad
LC-2
Payload
—
Target orbit
SSO
Nuri | Flight Test 2 cover image

Mission timeline

  1. 2022-06-21T07:00:00.000Z
    Liftoff
    Nuri roars off the pad at Naro Space Center, South Korea.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in SSO.
  7. Mission success
    All mission objectives achieved.

Last updated: