Mir (3 stage) | S-STEP
Operated by Agency for Defense Development, the Earth Science mission Mir (3 stage) | S-STEP delivered its payload into LEO.
- Launch time
- Status
- SUCCESS
- Operator
- Agency for Defense Development
- Mission type
- Earth Science
- Rocket
- Mir (3 stage)
- Launch site
- Sea Launch
- Launch pad
- ADD Offshore launch platform
- Payload
- —
- Target orbit
- LEO

Mission timeline
- 2023-12-04T05:00:00.000ZLiftoff confirmed — Mir (3 stage) is airborne.
- Max Q — Mir (3 stage) endures peak structural stress during ascent.
- First-stage main engine cutoff (MECO) confirmed.
- The spent first stage separates from the upper stage.
- Upper stage ignites, continuing the journey toward orbit.
- The mission reaches LEO, successfully entering orbit.
- The mission concludes successfully.