Mir (3 stage) | S-STEP

Operated by Agency for Defense Development, the Earth Science mission Mir (3 stage) | S-STEP delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
Agency for Defense Development
Mission type
Earth Science
Launch site
Sea Launch
Launch pad
ADD Offshore launch platform
Payload
—
Target orbit
LEO
Mir (3 stage) | S-STEP cover image

Mission timeline

  1. 2023-12-04T05:00:00.000Z
    Liftoff
    Liftoff confirmed — Mir (3 stage) is airborne.
  2. Max-Q
    Max Q — Mir (3 stage) endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches LEO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: