LVM-3 | Chandrayaan-3

Operated by Indian Space Research Organization, the Lunar Exploration mission LVM-3 | Chandrayaan-3 delivered its payload into LO.

Launch time
Status
SUCCESS
Operator
Indian Space Research Organization
Mission type
Lunar Exploration
Launch pad
Satish Dhawan Space Centre Second Launch Pad
Payload
—
Target orbit
LO
LVM-3 | Chandrayaan-3 cover image

Mission timeline

  1. 2023-07-14T09:05:17.000Z
    Liftoff
    LVM-3 (GSLV Mk III) lifts off from Satish Dhawan Space Centre, India.
  2. Max-Q
    LVM-3 (GSLV Mk III) passes through max aerodynamic pressure (Max Q).
  3. Main engine cutoff (MECO)
    Main engine cutoff — the first stage shuts down as planned.
  4. Stage separation
    Stage separation — the first stage separates cleanly.
  5. Second-stage ignition
    Second-stage engine ignites for the next phase of flight.
  6. Orbit insertion
    Orbit insertion confirmed — the vehicle is now in LO.
  7. Mission success
    Mission success — all objectives completed.

Last updated: