LVM-3 | Chandrayaan-2

LVM-3 | Chandrayaan-2 lifted off aboard a LVM-3 (GSLV Mk III) from Satish Dhawan Space Centre, India, carrying its payload to LO.

Launch time
Status
SUCCESS
Operator
Indian Space Research Organization
Mission type
Lunar Exploration
Launch pad
Satish Dhawan Space Centre Second Launch Pad
Payload
—
Target orbit
LO
LVM-3 | Chandrayaan-2 cover image

Mission timeline

  1. 2019-07-22T09:13:12.000Z
    Liftoff
    Liftoff confirmed — LVM-3 (GSLV Mk III) is airborne.
  2. Max-Q
    Max Q — LVM-3 (GSLV Mk III) endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches LO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: