LVM-3 | CARE (Demo Flight)

Operated by Indian Space Research Organization, the Test Flight mission LVM-3 | CARE (Demo Flight) delivered its payload into Sub.

Launch time
Status
SUCCESS
Operator
Indian Space Research Organization
Mission type
Test Flight
Launch pad
Satish Dhawan Space Centre Second Launch Pad
Payload
—
Target orbit
Sub
LVM-3 | CARE (Demo Flight) cover image

Mission timeline

  1. 2014-12-18T04:00:00.000Z
    Liftoff
    LVM-3 (GSLV Mk III) roars off the pad at Satish Dhawan Space Centre, India.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in Sub.
  7. Mission success
    All mission objectives achieved.

Last updated: