Long March 2E | BADR & Aussat-B-MFS

Operated by Ministry of Aerospace Industry, the Test Flight mission Long March 2E | BADR & Aussat-B-MFS delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
Ministry of Aerospace Industry
Mission type
Test Flight
Launch pad
Launch Complex 2 (LC-2)
Payload
—
Target orbit
LEO
Long March 2E | BADR & Aussat-B-MFS cover image

Mission timeline

  1. 1990-07-16T00:40:00.000Z
    Liftoff
    Long March 2E lifts off from Xichang Satellite Launch Center, People's Republic of China.
  2. Max-Q
    Long March 2E passes through max aerodynamic pressure (Max Q).
  3. Main engine cutoff (MECO)
    Main engine cutoff — the first stage shuts down as planned.
  4. Stage separation
    Stage separation — the first stage separates cleanly.
  5. Second-stage ignition
    Second-stage engine ignites for the next phase of flight.
  6. Orbit insertion
    Orbit insertion confirmed — the vehicle is now in LEO.
  7. Mission success
    Mission success — all objectives completed.

Last updated: