Gravity-1 | Maiden flight

Operated by Orienspace Technology, the Earth Science mission Gravity-1 | Maiden flight delivered its payload into LEO.

Launch time
Status
SUCCESS
Operator
Orienspace Technology
Mission type
Earth Science
Rocket
Gravity-1
Launch pad
Haiyang offshore launch location
Payload
—
Target orbit
LEO
Gravity-1 | Maiden flight cover image

Mission timeline

  1. 2024-01-11T05:30:00.000Z
    Liftoff
    Gravity-1 clears the pad at Haiyang Oriental Spaceport and begins its ascent.
  2. Max-Q
    Gravity-1 pushes through the region of maximum dynamic pressure.
  3. Main engine cutoff (MECO)
    First stage completes its burn; main engine cutoff.
  4. Stage separation
    First and second stages separate on schedule.
  5. Second-stage ignition
    Second-stage ignition confirmed.
  6. Orbit insertion
    Orbital insertion burn complete; now in LEO.
  7. Mission success
    Mission declared a complete success.

Last updated: