Falcon 9 Block 5 | Starlink Group 11-1

Falcon 9 Block 5 | Starlink Group 11-1 lifted off aboard a Falcon 9 from Vandenberg SFB, CA, USA, carrying its payload to LEO.

Launch time
Status
SUCCESS
Operator
SpaceX
Mission type
Communications
Rocket
Falcon 9
Launch pad
Space Launch Complex 4E
Payload
—
Target orbit
LEO
Falcon 9 Block 5 | Starlink Group 11-1 cover image

Mission timeline

  1. 2024-08-04T07:24:00.000Z
    Liftoff
    Liftoff confirmed — Falcon 9 is airborne.
  2. Max-Q
    Max Q — Falcon 9 endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches LEO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: