Falcon 9 Block 5 | Cygnus CRS-2 NG-21 (S.S. Francis R. “Dick” Scobee)
Falcon 9 Block 5 | Cygnus CRS-2 NG-21 (S.S. Francis R. “Dick” Scobee) lifted off aboard a Falcon 9 from Cape Canaveral SFS, FL, USA, carrying its payload to LEO.
- Launch time
- Status
- SUCCESS
- Operator
- SpaceX
- Mission type
- Resupply
- Rocket
- Falcon 9
- Launch site
- Cape Canaveral SFS, FL, USA
- Launch pad
- Space Launch Complex 40
- Payload
- —
- Target orbit
- LEO

Mission timeline
- 2024-08-04T15:02:53.000ZFalcon 9 lifts off from Cape Canaveral SFS, FL, USA.
- Falcon 9 passes through max aerodynamic pressure (Max Q).
- Main engine cutoff — the first stage shuts down as planned.
- Stage separation — the first stage separates cleanly.
- Second-stage engine ignites for the next phase of flight.
- Orbit insertion confirmed — the vehicle is now in LEO.
- Mission success — all objectives completed.