Atlas V 521 | Rainbow 1

Operated by Lockheed Martin, the Communications mission Atlas V 521 | Rainbow 1 delivered its payload into GSO.

Launch time
Status
SUCCESS
Operator
Lockheed Martin
Mission type
Communications
Launch pad
Space Launch Complex 41
Payload
—
Target orbit
GSO
Atlas V 521 | Rainbow 1 cover image

Mission timeline

  1. 2003-07-17T23:45:01.000Z
    Liftoff
    Atlas V 521 lifts off from Cape Canaveral SFS, FL, USA.
  2. Max-Q
    Atlas V 521 passes through max aerodynamic pressure (Max Q).
  3. Main engine cutoff (MECO)
    Main engine cutoff — the first stage shuts down as planned.
  4. Stage separation
    Stage separation — the first stage separates cleanly.
  5. Second-stage ignition
    Second-stage engine ignites for the next phase of flight.
  6. Orbit insertion
    Orbit insertion confirmed — the vehicle is now in GSO.
  7. Mission success
    Mission success — all objectives completed.

Last updated: