Ariane 5 ECA | XTAR-EUR, Maqsat-B2, Sloshsat

Arianespace flew Ariane 5 ECA | XTAR-EUR, Maqsat-B2, Sloshsat on a Ariane 5 ECA out of Guiana Space Centre, French Guiana, placing its payload in GTO.

Launch time
Status
SUCCESS
Operator
Arianespace
Mission type
Dedicated Rideshare
Launch pad
Ariane Launch Area 3
Payload
—
Target orbit
GTO
Ariane 5 ECA | XTAR-EUR, Maqsat-B2, Sloshsat cover image

Mission timeline

  1. 2005-02-12T21:03:00.000Z
    Liftoff
    Liftoff confirmed — Ariane 5 ECA is airborne.
  2. Max-Q
    Max Q — Ariane 5 ECA endures peak structural stress during ascent.
  3. Main engine cutoff (MECO)
    First-stage main engine cutoff (MECO) confirmed.
  4. Stage separation
    The spent first stage separates from the upper stage.
  5. Second-stage ignition
    Upper stage ignites, continuing the journey toward orbit.
  6. Orbit insertion
    The mission reaches GTO, successfully entering orbit.
  7. Mission success
    The mission concludes successfully.

Last updated: