Ariane 5 ECA+ | Galaxy 30, MEV-2 & BSAT-4B

The Communications flight Ariane 5 ECA+ | Galaxy 30, MEV-2 & BSAT-4B departed Guiana Space Centre, French Guiana atop a Ariane 5 ECA+, bound for GTO.

Launch time
Status
SUCCESS
Operator
Arianespace
Mission type
Communications
Launch pad
Ariane Launch Area 3
Payload
—
Target orbit
GTO
Ariane 5 ECA+ | Galaxy 30, MEV-2 & BSAT-4B cover image

Mission timeline

  1. 2020-08-15T22:04:00.000Z
    Liftoff
    Ariane 5 ECA+ clears the pad at Guiana Space Centre, French Guiana and begins its ascent.
  2. Max-Q
    Ariane 5 ECA+ pushes through the region of maximum dynamic pressure.
  3. Main engine cutoff (MECO)
    First stage completes its burn; main engine cutoff.
  4. Stage separation
    First and second stages separate on schedule.
  5. Second-stage ignition
    Second-stage ignition confirmed.
  6. Orbit insertion
    Orbital insertion burn complete; now in GTO.
  7. Mission success
    Mission declared a complete success.

Last updated: