Ariane 44LP | Orion 2

Operated by Arianespace, the Communications mission Ariane 44LP | Orion 2 delivered its payload into Direct-GEO.

Launch time
Status
SUCCESS
Operator
Arianespace
Mission type
Communications
Launch pad
Ariane Launch Area 2
Payload
—
Target orbit
Direct-GEO
Ariane 44LP | Orion 2 cover image

Mission timeline

  1. 1999-10-19T06:22:00.000Z
    Liftoff
    Ariane 44LP lifts off from Guiana Space Centre, French Guiana.
  2. Max-Q
    Ariane 44LP passes through max aerodynamic pressure (Max Q).
  3. Main engine cutoff (MECO)
    Main engine cutoff — the first stage shuts down as planned.
  4. Stage separation
    Stage separation — the first stage separates cleanly.
  5. Second-stage ignition
    Second-stage engine ignites for the next phase of flight.
  6. Orbit insertion
    Orbit insertion confirmed — the vehicle is now in Direct-GEO.
  7. Mission success
    Mission success — all objectives completed.

Last updated: