Ariane 3 | ECS 2 & Télécom 1A

Ariane 3 | ECS 2 & Télécom 1A rode a Ariane 3 into space from Guiana Space Centre, French Guiana, deploying its payload to Direct-GEO.

Launch time
Status
SUCCESS
Operator
Arianespace
Mission type
Communications
Rocket
Ariane 3
Launch pad
Ariane Launch Area 1 (ELV)
Payload
—
Target orbit
Direct-GEO
Ariane 3 | ECS 2 & Télécom 1A cover image

Mission timeline

  1. 1984-08-04T13:32:54.000Z
    Liftoff
    Ariane 3 roars off the pad at Guiana Space Centre, French Guiana.
  2. Max-Q
    The vehicle reaches Max Q, the highest aerodynamic load of the flight.
  3. Main engine cutoff (MECO)
    MECO — first-stage propulsion ends after a nominal burn.
  4. Stage separation
    Clean stage separation confirmed.
  5. Second-stage ignition
    The upper-stage engine lights up after separation.
  6. Orbit insertion
    Orbit insertion confirmed — now circling in Direct-GEO.
  7. Mission success
    All mission objectives achieved.

Last updated: